With extensive experience in Saudi Arabia’s industrial cities, WAMCO has delivered instrumentation and automation solutions that streamline utilities and water networks. As MODON evolves, our systems scale with it – ensuring reliability across sectors.
From sewage treatment plants to reservoir-level monitoring, WAMCO supports water authorities with end-to-end engineering – deploying Siemens PLCs, radar-level transmitters, and flow instruments that power efficient wastewater and water treatment systems. Our work with NWC and MARAFIQ ensures sustainable operations where every drop counts.
NEOM demands innovation, scale, and uncompromising quality. WAMCO delivers all three – with projects that include advanced PLC systems, instrumentation networks, and smart diagnostics designed to serve next-generation urban infrastructure.
WAMCO brings deep technical capability to energy-sector projects, including redundant PLC systems, PCS7 control architecture, and intelligent instrumentation. Our work with ARAMCO and private energy clients ensures safe, efficient, and scalable plant performance.
WAMCO supports urban infrastructure with scalable automation and instrumentation for water networks, public utilities, and green spaces. From King Salman Park to advanced batching systems, we deliver reliability in every connection.
Have a look at the detailed snapshot of WAMCO’s diverse project history, highlighting sectors served, services delivered, and technologies deployed. From mega infrastructure developments to specialized industrial installations, this is a showcase of the scale, complexity, and consistency of our work across Saudi Arabia and beyond.
| Sl No. | Project Name | Location | Scope of Work | Siemens PLC | Siemens HMI | Commissioning Highlights |
|---|---|---|---|---|---|---|
| 1 | Saline Water Conversion Corporation | Dammam, Saudi Arabia | Supply, Design and Configuration, PLC Panel, MCC Panel, Supply of Instruments | S7-1500 | Comfort Panel (KTP900) | SCADA integration, robust performance in saline environments |
| 2 | Infrastructure MODON Dammam 1st Industrial City | Dammam, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | KTP400 Basic Panel | Industrial-grade durability, parameterization via TIA Portal |
| 3 | Infrastructure MODON Dammam 2nd Industrial City | Dammam, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | KTP700 Basic Panel | Batching control integration, on-site calibration |
| 4 | Infrastructure MODON Dammam 3rd Industrial City | Dammam, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1500 with ET 200SP | TP1200 Comfort Panel | Pumping Station - SCADA, MCC motor control integration |
| 5 | Infrastructure MODON Al Kharaj – Phase-2 | Al Kharaj, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | KTP700 | Reliable monitoring of utilities, modular IO integration |
| 6 | MODON AL KHARAJ – STP Station | Al Kharaj, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1500 | TP900 Comfort Panel | Efficient wastewater management-SCADA- PLC Panel |
| 7 | AL KHARAJ – Pumping Station | Al Kharaj, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | KTP400 | Standardized with TIA Portal library blocks |
| 8 | MARAFIQ – STP Plant – Jubail | Jubail, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1500 | TP1200 Comfort Panel | High-reliability system design |
| 9 | KHUMRAH STP Plant – NWC | Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | KTP700 | Efficient sewage processing |
| 10 | RED SEA Project - Subsurface WTP | Red Sea Region, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1500 | TP900 Comfort Panel | Marine-grade equipment configuration |
| 11 | SINDALAH – Subsurface WTP | Sindalah, NEOM | Supply, Design and Configuration of Instruments | S7-1200 | TP700 Comfort Panel | Compact instrumentation for island conditions |
| 12 | SINDALAH Island Treatment Plant – NEOM | NEOM, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1500 | TP1200 Comfort Panel | Smart diagnostics enabled |
| 13 | King Salman Park | Riyadh, Saudi Arabia | Supply of PLC | SCADA System | S7-1500 | Not applicable | Central SCADA system integration |
| 14 | KSAB-BSS JV WET Utilities Project – Saudi Aramco | Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | KTP700 Basic Panel | Compliance with Aramco specifications |
| 15 | Saraya Alnarjes PS Project – Ministry of Housing | Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1200 | TP-700 | Urban wastewater instrumentation |
| 16 | RC Yanbu Project | Yanbu, Saudi Arabia | Supply, Design and Configuration of Instruments | S7-1500 | TP1200 Comfort Panel | Heavy industrial standards |
| 17 | Manfouha Sewage Treatment Plant Project | Riyadh, Saudi Arabia | Installation, Testing, and Commissioning Instrument Packages. | None | None | Large-scale flow monitoring |
| 18 | Layout for Batching Area – NEOM | NEOM, Saudi Arabia | Supply, Design and Configuration of Instruments -200 Flowmeters | None | None | Modular and scalable layout |
| 19 | AL ULA Ashar WTP Project – Royal Commission for AlUla | AlUla, Saudi Arabia | Supply, Installation, Testing, and Commissioning of Pieces Flowmeters | None | None | Royal Commission standards met |
| 20 | NEOM Village 10 K | NEOM, Saudi Arabia | Supply, Installation, Testing & Commissioning of Instruments, PLC Panel, MCC Panel | S7-1500 | TP-700 | Village infrastructure automation |
| 21 | Tank Farm Storage –Iffco Yanbu | Saudi Arabia | Supply, Design and Configuration | PLC Panel | MCC Panel | Supply of Instruments | S7-1500 | TP900 | Bulk liquid storage monitoring - SCADA |
| 22 | IWWTP - UGF – RC Yanbu | Yanbu, Saudi Arabia | Supply, Design and Configuration | PLC Panel | MCC Panel | Supply of Instruments | S7-1500 | TP1200 Comfort Panel | Industrial wastewater automation |
| 23 | RO - UGF - RC Yanbu | Yanbu, Saudi Arabia | Supply, Design and Configuration | PLC Panel | MCC Panel | Supply of Instruments | S7-1500 | TP1200 | RO system instrumentation and control |
| 24 | MINA NWC PROJECT | Makkah, Saudi Arabia | Supply, Design and Configuration | PLC Panel | MCC Panel | Supply of Instruments | S7-1200 | TP1200 | Automated the tank filling |
| 25 | RIYAS PROJECT -Aramco | Jubail, Saudi Arabia | Installation of level Transmitter, Float level switches, Pressure Transmitter. | S7-1200 | TP900 | Automated the Tank Filling |
| 26 | Fadhili PROJECT –Aramco | Jubail, Saudi Arabia | Installation of level Transmitter, Float level switches, Pressure Transmitter. | S7-400H | MTP700, Unified | Lifting station and Pumping station |